Follow
the podcast on
There's assurance scoping work on a second Auckland Harbour crossing is still under way, with plans expected mid-year.
Two Transport Agency reports have detailed defects in the 67 year-old bridge, and warn it's at risk of failure.
It says without long-term strengthening work, month-long lane closures, truck limits, and more wind-related restrictions are on the cards.
Chris Bishop says he won't be the Transport Minister who produces a pie-in-the sky idea that turns to custard.
He says they're taking an evidence led approach, engaging with the market, doing geotechnical assessments and extensive studies.
LISTEN ABOVE
Take your Radio, Podcasts and Music with you