Billions could be saved if we had a more concrete infrastructure project timeline. Â
An Infrastructure New Zealand-commissioned report shows streamlining delivery could result in savings of more than 26% on future projects.Â
CEO Nick Leggett says if applied, these savings could increase the amount spent on delivery by between 2.3-billion and 4.7-billion-dollars a year, over the 2025-31 period. Â
He says planning, procurement, and people become more secure, and as a result the money saved can be reinvested.Â
LISTEN ABOVEÂ
Take your Radio, Podcasts and Music with you